Engineering group · Global reach

Conele Systems & Synk Systems

High-quality electrical, engineering & load bank solutions — from concept to delivery.

With a strong manufacturing foundation and forward-looking R&D, our group operates through two specialized entities:

  • ⚙️ Conele Systems Pvt. Ltd. – Core manufacturing & execution arm.
  • 🔬 Synk Systems Pvt. Ltd. – Innovation, R&D & load bank specialization.
2020 → 2026

From local startup to global supplier, entering aerospace & marine sectors.

2020Started as Conele.in
2023Incorporated Conele Systems (Chhani, Vadodara)
2023–25Rapid growth ✅ International orders ✈️ Aerospace entry
2026Formed Synk Systems – load bank & R&D powerhouse
Infrastructure expansion · Owned facility

🏭 New Manufacturing Hub – Kotambi, Vadodara

21,000 sq. ft.(7000Sq. ft x three-story building) owned facility
1 May 2026 Go-Live Date
✅ Built Construction completed

🔹 Increased capacity · Enhanced quality control · Operational efficiency · A major step toward global scale.

3D architectural renders | The Building Factory

📍 Kotambi, Vadodara · Owned manufacturing facility · Construction complete · Impact: capacity + quality leap
Infrastructure expansion · Owned facility

🏭 New Manufacturing Hub – Kotambi, Vadodara

Total area: 21,000 sq. ft., comprising a three-story building with 7,000 sq. ft. on each floor. owned facility
1 May 2026 Go-Live Date
✅ Built Construction completed

🔹 Increased capacity · Enhanced quality control · Operational efficiency · A major step toward global scale.

3D architectural renders | The Building Factory

📍 Kotambi, Vadodara · Owned manufacturing facility · Construction complete · Impact: capacity + quality leap
Two entities · One vision

Group Synergy: Core Focus Areas

FeatureConele Systems Pvt. Ltd.Synk System Pvt. Ltd.
Primary RoleManufacturing ExcellenceInnovation & R&D
Operational FocusExecution & DeliveryProduct Development
Strategic StrengthInfrastructure StrengthSpecialized Load Banks
Market GoalEstablished Client BaseGlobal Market Expansion

🔌 Synk's Specialized Offerings

  • ⚡ Exclusive Load Bank Solutions (incl. prototype & liquid-cooled)
  • 📦 Make-to-Stock Model · ready-to-dispatch load banks
  • 🧪 Engineering Services: dedicated research & design
Trusted by industry leaders · Marine & Aerospace

Global Partnerships & Projects

⚓ Marine Electricals (India) Ltd

Mumbai | Marine & automation solutions

Order: LBA-750RL total 2 sets (750 KVA Resistive / 687 KVA Reactive) with Testcraft software.
Integrated electrical & automation solutions.

marineelectricals.com →
🏭 Narhari Engineering Works

Palghar | Electric motors & control panels

Order: LBA 690RL 1 set (807KW Resistive / 900KVAR Reactive).

narhariengg.com →
✈️ Bauer Inc. (USA – Aerospace)

Bristol, CT · World leader in test systems for aircraft components

Order: SSA-200 1 set (Load Bank: 200KVA, 115/200VAC).

bauerct.com →
🚀 Testek Solutions (USA – Aerospace)

Wixom, MI · Turnkey aerospace test stands

Major collaboration: Generator Test System, total 32 sets.

testek.com →
Aerospace credibility – partnered with Bauer & Testek Solutions for advanced ground test systems, driving global scale.
Roadmap 2026 & beyond

Future Vision: Global Leader in Load Bank & Engineering

Our vision is to deliver innovative, reliable, high-performance systems worldwide.

Scale Production – New Kotambi facility meets global demand
Technological Advancement – Continuous R&D in advanced load bank tech
Market Readiness – Strengthen make-to-stock for rapid deployment
Excellence – Speed, quality and engineering superiority
Make-to-Stock Model

Ready-to-dispatch load banks for faster lead times, backed by dedicated R&D from Synk Systems.


2026+ Expansion into advanced liquid-cooled systems and next-gen aerospace test equipment.
SYNK SYSTEMS PVT LTD

THANKS...

Synk Systems' new manufacturing nucleus – Designed for operational excellence, the Kotambi plant reflects modern engineering aesthetics and functional layout.
3D visualizations courtesy of The Building Factory | Ketan Patel (architectural design partner). The renders showcase the facility's streamlined production zones, R&D labs, and future-ready infrastructure.

Construction completed – move-in May 2026, marking new era for Conele & Synk.

🏭
THE BUILDING FACTORY
KETAN PATEL